Perth · acid plants · shutdowns
Software that matches the vessel, not the org chart.
Live job boards for tower work — headers, troughs, packing, grates, candles — so nightshift can see what is in, what is out, and what is next.
- Built on
- drawings
- Used on
- nightshift
- Based in
- Perth, WA
What we ship
Status is the source of truth, not a spreadsheet tab.
-
01
3D status models
Plant geometry from the drawings. Parts pull in sequence. The model is the board — not a picture of one.
-
02
Shift handover
Cubic metres vacuumed, parts removed, holds. Copy a handover in one tap for the incoming crew.
-
03
Crew-first UI
Dark, glove-usable, works on a dusty tablet. Hide the shell, frame a grate, log packing. No login wall on the floor.
Featured
41-CM-03 HRS Tower · 2026 shutdown
Glencore Murrin Murrin. Primary-stage headers split at the ADP flanges, 23 packing-grate panels, 150.6 m³ of 3″ APT Standard Saddles, 106 MECS fibre-bed candles. The board tracks dismantle and reassembly in plant order.
The live crew tool stays on the shutdown network. This site is the public face of the work — not the floor instance.
Contact
Talk while the plant is still standing.
Jamie Young · APMS · Perth, Western Australia